Author
|
Topic: BR17 BUILD (Read 1221 times)
|
|
steve jones
|
Hello Anthony, This represents around 250 hours work, ( help required to turn it over). Next stage will be making good the surface for painting, I intend paiting up to the rubbing strake area, but finish paint below water line, under coat above. Mistake I made was not fixing the transom to aft bulkhead plate by the small hatch, it will require some upside down epoxying. I will form a contained hatch here to enable a small dry locker .
Steve Jones
|
|
|
|
Logged
|
|
|
|
|
Anthony Huggett
|
Looking good, Steve!
I got held up for a few weeks trying to find a whole day to tackle the glass cloth for the floor of the tank. If I can get the big jobs out of the way, (I\\\'ve still got to do the floor and foam) then hopefully I can make swifter progress on the interior.
Regards,
Anthony
|
|
|
|
|
Logged
|
|
|
|
|
 |